GET 33% OFF YOUR FIRST 12 MONTHS!

Limited time - use promo code: CYBERMON33 at checkout

Live stream preview

Watch this video and more on SAILFLIX

Watch this video and more on SAILFLIX

The BIG Sailboat Project

TBSBP - Ep6: Finishing Begins (HD)

Season 2, Episode 1 • 26m

Up Next in Season 2: Finishing & Sea Trials

  • TBSBP - Ep7: Finishing 2 (HD)

    Down below, Sandra and Gina start the first woodworking project-a large wooden bulkhead in the center of the boat, add stand pipes through the hull bottom for the main cockpit drains, test and install hull transducers confined inside a watertight box, add fittings to the waste holding tank and st...

  • TBSBP - Ep8: Finishing 3 (HD)

    On deck, Sandra builds the hatch frames, hinges, and dogs to batten them down, then adds the Lexan lenses. She builds and installs several mushroom vents into the deck for ventilation, attaches safety hooks for harnesses in foul weather, cuts out the hole for the mast and adds parallel bung rails...

  • TBSBP - EP9: Finishing 4 (HD)

    Sandra builds the cockpit steering station and adds more deck vents including a chimney for the diesel cabin heater. Next she and Gina fabricate the transom radar arch from steel tubing, add mounts for hand rail and life line stanchions, and hawse holes for mooring lines. Next Sandra starts build...